30 June 2026

Operational Site
Eliwana's advanced low-profile plant is proving mining operations can run with less diesel and lower costs.
Location
Australia
Product
Hematite
Capacity
Battery
Status
Operational

Eliwana was designed differently from day one.
Commissioned in 2020, its advanced low-profile plant can direct load up to 5,200 tonnes of ore per hour. Faster movement. Lower energy use. Long-term operational efficiency built into the system from the start.
Located in Nanutarra in Western Australia’s Pilbara region, on Puutu Kunti Kurrama and Pinikura Country, Eliwana is now helping lead the next shift in heavy industry.
Built for performance. Built for what comes next.
Eliwana is one of the first sites in our network being designed around renewable energy systems at scale.
Battery storage and transmission infrastructure are reshaping how heavy industry gets powered.
This isn’t theory. It’s energy infrastructure built to keep real operations moving.
We’re cutting fossil fuels out of iron ore operations. Scaling renewable energy infrastructure. Deploying the systems needed to decarbonise heavy industry.
And Eliwana is helping lead that shift.
If you want to work where new energy systems are being built at scale, this is the place.
Join us.
Follow the projects, progress and breakthroughs driving Real Zero across our Pilbara operations.

30 June 2026

29 June 2026

23 June 2026
.jpg%3Fh%3D2962%26iar%3D0%26w%3D5272&w=3840&q=75)
22 June 2026

16 June 2026

12 June 2026

12 June 2026

5 June 2026

26 May 2026

25 May 2026