Cloudbreak Solar Farm

190MW solar project supporting operations across the Chichester Hub.

Project Data

  • Location

    Australia

  • Product

    Solar Farm

  • Capacity

    190MW

  • Status

    Operational

Powering the Chichester Hub

Built to support our operations.

At 190MW, Cloudbreak Solar Farm will significantly increase the renewable energy available across our operations, cutting diesel use and strengthening the Green Grid.

This isn’t a single site solution.

It’s power for a system.

Fast Facts

190MW

Solar capacity under construction

300k+

Solar panels installed

Connected

To the Green Grid

20241211 - Pilbara Solar Panel (4).jpg

Part of the system

Cloudbreak Solar Farm is built to feed the Green Grid.

Power generated here can move through the network, be stored and dispatched through battery systems, and be sent across our operations through high-voltage transmission.

Generation. Storage. Transmission.

Working together to power real operations.
 

Explore the Green Grid

Real Zero in Motion

This is how we get there.

Project by project, we’re adding capacity, strengthening reliability and cutting fossil fuels out of our operations.

Not someday. Now. 

Explore the projects powering Real Zero

  • North Star Junction

    100MW solar farm powering Iron Bridge operations.

  • north star solar farm

    Solomon Solar Farm

    440MW large-scale solar development - one of the biggest in Western Australia.